On September 5, 2008, the second of the two world's largest tunnel boring machines (Herrenknecht Mixshield S-318, diameter 15.43m) reached its target shaft.
Breakthrough in Spain on September 25. The Herrenknecht Double Shield S-373 drives two tunnels with record breaking performance.